Integrated System Test Design Support
B&W mPower™ Integrated System Test Facility
Babcock & Wilcox Company (B&W) chose the Center for Advanced Engineering and Research (CAER) facility as the location for their mPower™ Integrated System Test (IST) facility. The IST facility includes a scaled prototype of the mPower™ reactor that will undergo extensive testing.
Wiley|Wilson designed the CAER facility modifications to accommodate the IST facility and provided engineering assistance to B&W for the design of actual IST components. Wiley|Wilson’s responsibilities included engineering design services and coordination of installation of the IST facility with the general contractor.